HomeUK Electrician (BS 7671)Bathroom Zones Under BS 7671: Zones 0, 1 and 2 Explained

Bathroom Zones Under BS 7671: Zones 0, 1 and 2 Explained

VoltageLab Electrician App icon
VoltageLab
The all-in-one app every electrician needs
Scan to install the VoltageLab Electrician AppScan to install

The customer wants a downlight over the bath, a heated towel rail by the basin and a double socket “just inside the door” for the hair dryer. Every one of those requests has an answer in BS 7671, and the answer depends on where the item sits relative to the bath or shower. Get the positions right and the job is simple. Get one wrong and it is a C2 on the next EICR, or a failed assessment.

Bathroom zones catch people because the boundaries are invisible and the rules changed twice in recent editions. Zone 3 was dropped in 2008. The socket distance came down from 3 m to 2.5 m in 2018. Walk-in showers are measured in a completely different way from a bath. Most of the wrong advice you will hear is someone remembering a version of the rules that has since changed.

This guide covers what Section 701 applies to, how to measure zones 0, 1 and 2 around a bath and a shower, the IP rating each zone needs, what you can and cannot fit in each one, the 30 mA RCD and supplementary bonding rules, and where Part P comes in.

Quick Answer

Bathroom zones are the three areas around a bath or shower defined in BS 7671 Section 701. Zone 0 is the inside of the bath or shower tray. Zone 1 is the space directly above it, up to 2.25 m from the floor or up to the highest fixed shower outlet if that is higher. Zone 2 extends 0.6 m out from the edge of zone 1, to the same height. Everything else in the room is outside the zones.

Equipment in zones 1 and 2 must be at least IPX4, and zone 0 needs IPX7 at SELV 12 V. No 230 V switches or sockets are allowed in any zone. Ordinary sockets must be at least 2.5 m horizontally from the zone 1 boundary, and every circuit in the room needs 30 mA RCD protection.

Key Takeaways

  • BS 7671 has three bathroom zones, numbered 0, 1 and 2. Zone 3 was removed in the 17th Edition and no longer exists.
  • Zone 1 goes up to 2.25 m above the finished floor, or to the highest fixed shower head if it is mounted higher.
  • A shower without a tray has a zone 1 radius of 1.2 m from the fixed water outlet and no zone 2.
  • Equipment in zones 1 and 2 needs at least IPX4, or IPX5 where water jets are used for cleaning. Zone 0 needs IPX7.
  • Sockets other than SELV and shaver supply units must be at least 2.5 m horizontally from the boundary of zone 1.
  • Every circuit of a room with a bath or shower needs a 30 mA RCD under Regulation 701.411.3.3, whether it serves the zones or not.
  • Supplementary bonding can be left out of a bathroom only when all three conditions in Regulation 701.415.2 are met.

What Section 701 covers and how the bathroom zones are measured

Section 701 is one of the special locations in Part 7 of BS 7671. It applies to any location containing a fixed bath or shower, and to the space around it. That includes en-suites, wet rooms, a shower cubicle in a bedroom and a bath in a utility room. It does not apply to emergency eye-wash or shower facilities in workplaces. The reason it exists is simple: wet skin and a body in contact with earthed water pipes lower the resistance of the body, so a shock that would be survivable in a dry room can be fatal in a bath.

Bathroom zones around a bath, side elevation: zone 0 inside the bath, zone 1 above the rim to 2.25 m, zone 2 extending 0.6 m beyond
Zones around a bath, measured from the rim and the finished floor.

The zones are measured from the bath or shower itself, taking into account walls, doors, fixed partitions and the ceiling. A wall or a fixed glass screen stops a zone. If you imagine a string pulled tight from the edge of the bath round the end of the screen, the zone follows the string, not a straight line through the glass.

Zone 0

Zone 0 is the interior of the bath tub or shower basin. For a shower with no tray, zone 0 is a layer 0.10 m high above the floor, with the same horizontal extent as zone 1. Very little electrical equipment belongs here. What does must be fixed, permanently connected, made for use in zone 0, rated at least IPX7 and supplied at SELV no higher than 12 V AC or 30 V ripple-free DC, with the safety source outside zones 0, 1 and 2.

Zone 1

Zone 1 is the space directly above zone 0. Horizontally it is bounded by the vertical plane of the bath rim or tray edge. Vertically it runs from the finished floor up to 2.25 m, or up to the horizontal plane of the highest fixed shower head or water outlet if that is above 2.25 m. The space under a bath or shower tray is also zone 1, unless the panel can only be removed with a tool. If it can only be opened with a tool, the space underneath is outside the zones.

Zone 2

Zone 2 is a band 0.6 m wide around the outside of zone 1, from the floor up to the same height as zone 1. Where the bath is against a wall, zone 2 only exists on the open sides. Zone 2 does not wrap over the top of zone 1, so the ceiling above 2.25 m over a bath is outside the zones unless a fixed shower outlet is mounted above that height.

What happened to zone 3?

The 16th Edition had a zone 3 that reached a further 2.4 m beyond zone 2. It was removed in 2008 when the 17th Edition brought in 30 mA RCD protection for every circuit in the room. The 18th Edition kept that approach. If a textbook, a light fitting box or an old EICR mentions zone 3, it was written to rules that are no longer current. The space outside zone 2 is now simply “outside the zones”.

Bathroom zones compared: IP ratings and what each zone allows

Regulation 701.512.2 sets the minimum IP rating for equipment in each zone. The second figure of an IP code is the water rating. X4 means protected against splashing from any direction, X5 against water jets and X7 against temporary immersion. Our guide to IP ratings breaks the full code down.

Bathroom zones compared: zone 0 IPX7 SELV 12 V, zone 1 IPX4 fixed equipment, zone 2 IPX4 no switches or sockets except SELV and shaver units
Minimum IP rating and permitted equipment in each zone.
Zone 0 Zone 1 Zone 2
Where it is Inside the bath or tray Above the bath or tray to 2.25 m, and under it if open without a tool 0.6 m beyond zone 1, to the same height
Minimum IP rating IPX7 IPX4 (IPX5 with cleaning jets) IPX4 (IPX5 with cleaning jets)
Fixed equipment Only equipment made for zone 0, at SELV 12 V Showers, pumps, fans, towel rails, water heaters, luminaires, whirlpool units Any fixed equipment suitable for the location
Switches None SELV only, max 12 V AC / 30 V DC SELV only
Sockets None None SELV sockets and BS EN 61558-2-5 shaver supply units only

The equipment list for zone 1 comes from Regulation 701.55. Each item must be fixed, permanently connected and suitable for zone 1 according to the manufacturer’s instructions. A towel rail on a plug is not permanently connected, so it does not qualify, however well it is sealed.

Measuring the socket distance from the wrong edge: the 2.5 m rule in Regulation 701.512.3 is measured horizontally from the boundary of zone 1, which is the edge of the bath or tray, not from the edge of zone 2. People measure from zone 2 and fit a socket 2.5 m beyond it, which is fine, or they measure 2.5 m from the tap end of the bath and forget the open side, which is not. Measure from the nearest point of the rim or tray. If the room is too small to get 2.5 m, there is no 230 V socket in that room. Use a shaver supply unit instead.

Shower zones: tray, walk-in and wet room

A shower with a tray is zoned like a bath. Zone 0 is inside the tray, zone 1 is directly above it, and zone 2 is 0.6 m beyond the tray edge, limited by any walls or fixed screens. A walk-in or wet-room shower with no tray is measured differently, because there is no rim to measure from.

Shower zones plan view: shower tray with zone 1 over the tray and zone 2 0.6 m beyond, wet room with 1.2 m zone 1 radius from the fixed outlet and no zone 2
A tray-less shower is zoned by a 1.2 m radius from the fixed outlet.

Without a basin, zone 1 is everything within 1.2 m horizontally of the centre of the fixed water outlet on the wall or ceiling, up to 2.25 m or the outlet height if higher. There is no zone 2. A fixed partition such as a glass screen still limits the zone, so a 1.2 m arc that meets a screen follows round its end. A handheld shower on a riser rail is measured from the fixed outlet where the hose connects, not from wherever the head is hanging.

LocationZone 0Zone 1Zone 2
BathInside the tubAbove the rim to 2.25 m (or highest fixed outlet); under the bath unless closed with a tool0.6 m beyond the rim, to the same height
Shower with trayInside the trayAbove the tray to 2.25 m (or highest fixed outlet)0.6 m beyond the tray edge, to the same height
Shower without tray0.10 m high, same footprint as zone 11.2 m radius from the fixed water outlet, to 2.25 m (or outlet height)None
Any of the aboveZones are limited by walls, ceilings, doors and fixed partitions
Zone dimensions from BS 7671:2018+A2 Section 701 (Regulation 701.32 and Figures 701.1 and 701.2). Heights are from the finished floor level. Check against your copy of the current amendment before quoting on a certificate.

How to zone a bathroom, step by step

  1. Find the reference edge. For a bath or tray it is the outer rim. For a tray-less shower it is the centre of the fixed water outlet.
  2. Find the zone 1 height. Measure the highest fixed shower head or outlet from the finished floor. Zone 1 goes to 2.25 m or that height, whichever is greater.
  3. Mark zone 1. Straight up from the rim or tray edge, or a 1.2 m radius from the outlet if there is no tray.
  4. Check under the bath. If the bath panel lifts off by hand, the space underneath is zone 1. If it is screwed, the space is outside the zones.
  5. Mark zone 2. Add 0.6 m beyond zone 1 on every open side, to the same height. Skip this for a tray-less shower.
  6. Apply the partitions. Stop each zone at walls and fixed screens, and measure round the ends of screens rather than through them.
  7. Mark the 2.5 m socket line from the nearest point of the zone 1 boundary.
  8. Place each item and check its IP rating and type against the zone it lands in.

The one that catches everyone: a fixed shower head mounted high raises zone 1 with it. Put a rainfall head on a ceiling arm at 2.4 m and zone 1 now reaches 2.4 m, so the downlight next to it that would have been outside the zones at 2.3 m is in zone 1. It needs IPX4 and must be suitable for zone 1. Measure the shower outlet before you choose the light fittings, not after the ceiling is boarded.

RCDs, supplementary bonding and SELV in a bathroom

Regulation 701.411.3.3 requires additional protection by a 30 mA RCD for every low voltage circuit of the location. That means the lighting, the shower, the fan, the towel rail and any socket outside the zones. Circuits that only pass through zones 1 or 2 on their way to somewhere else need RCD protection too. There is no exception for a risk assessment or for a circuit that “only feeds the light”. A dedicated 30 mA RCBO per circuit is the usual way to do it, so a fault on the shower does not take the bathroom lights out with it.

When supplementary bonding can be left out

Supplementary equipotential bonding connects exposed-conductive-parts and extraneous-conductive-parts in the room together, so that no dangerous voltage can appear between a metal bath and a radiator during a fault. Regulation 701.415.2 lets you omit it, but only if all three of these apply:

  • All final circuits of the location meet the disconnection times of Regulation 411.3.2.
  • All final circuits of the location have additional protection by a 30 mA RCD.
  • All extraneous-conductive-parts of the location are effectively connected to the main protective bonding, in line with Regulation 411.3.1.2.

The third condition is the one that needs testing, not assuming. If the copper pipes enter the bathroom through a run of plastic pipe, they may not be connected to main bonding at all. Check continuity from the pipework to the main earthing terminal before you leave the supplementary bonding out. Pipework that is entirely plastic is not extraneous and does not need bonding. Our article on the importance of earthing rules explains why the bonding path matters.

SELV in the zones

Separated extra-low voltage is the only way to get a switch into zone 1, or a socket into zone 2. The transformer or driver that is the safety source must be outside zones 0, 1 and 2. That catches out installers who fit a 12 V downlight in the bath ceiling and push its driver up through the cut-out, because the driver then sits in zone 1. Fit the driver outside the zones, or use a mains downlight rated for the zone instead.

What you can and cannot install in the bathroom zones

What is allowed in bathroom zones 1 and 2: showers, IPX4 lights, fans, towel rails and SELV permitted; sockets, 230 V switches, fused spurs and plug-in appliances not permitted
What can and cannot go in zones 1 and 2.

Permitted in zones 1 and 2

  • Electric showers and shower pumps, permanently connected and rated for the zone
  • Luminaires and downlights of at least IPX4
  • Extractor fans, with the fan isolator outside the zones
  • Fixed heated towel rails and heaters, fed from a fused connection unit outside the zones
  • Fixed water heaters and whirlpool bath units
  • SELV equipment with the safety source outside zones 0, 1 and 2
  • Insulating pull cords of cord-operated switches, which BS 7671 exempts from the switch rules

Not permitted in zones 1 and 2

  • 230 V light switches, dimmers and switched accessories
  • Fused connection units, spur switches and fan isolators
  • Any 13 A socket, and any socket within 2.5 m of the zone 1 boundary other than SELV or a shaver supply unit
  • Portable or plug-in appliances, including plug-in heaters
  • Any equipment rated below IPX4

Shaver sockets, pull cords and electric showers

A shaver supply unit to BS EN 61558-2-5 contains an isolating transformer, so it is allowed in zone 2 and outside the zones, but not in zone 1. Keep it out of direct spray from the shower. A shaver point without a transformer is a different product and does not qualify. The insulating cord of a ceiling pull switch can hang in any zone. The usual layout is a pull-cord switch for the light inside the door, or a standard plate switch outside the room. An electric shower needs its own circuit, a 30 mA RCD and a double-pole isolator, normally a ceiling pull-cord switch, outside zones 1 and 2. The circuit is sized for the shower rating, typically 40 A to 50 A for showers from 8.5 kW to 10.5 kW.

Bathrooms vs other special locations in BS 7671 Part 7

Location Section Zones Key protective measure
Bath or shower 701 0, 1, 2 30 mA RCD on every circuit; IPX4 in zones 1 and 2
Swimming pools and fountains 702 0, 1, 2 SELV in zone 0; supplementary bonding; higher IP ratings
Saunas 703 1, 2, 3 (by temperature) 30 mA RCD; heat-rated equipment and wiring
Underfloor and ceiling heating 753 None 30 mA RCD; earthed metal sheath or grid in bathrooms
Kitchen Not a special location None General rules; sockets RCD-protected under 411.3.3

Electric underfloor heating is common in bathrooms, and Regulation 701.753 adds to Section 753. Heating units under the floor in a bathroom need a metal sheath, metal enclosure or fine-mesh metallic grid connected to the protective conductor, unless they are supplied at SELV. Before you open any bathroom circuit, follow the safe isolation procedure, because a shower circuit can be fed from a different way to the lights. For siting the accessories outside the zones, see our notes on installing switches and sockets, and for the protective devices at the board, the types of MCB. Working to the NEC instead? The US handles the same risk with GFCI protection rather than zones, covered in our GFCI vs AFCI guide.

Should you leave out supplementary bonding?

Omitting it: pros

  • Fewer bonding clamps to fail, corrode or be removed by a plumber.
  • No green-and-yellow conductors to route round a finished bathroom.
  • Fully permitted by Regulation 701.415.2 once all three conditions are proven.

Omitting it: cons

  • Relies on main bonding still being intact years later, which you cannot see from the bathroom.
  • A later alteration with plastic pipe can break the path to main bonding without anyone noticing.

On a new installation or a full rewire with RCBOs on every circuit and tested main bonding, omitting supplementary bonding is normal and correct. On an older property where you cannot prove the main bonding or the pipework is mixed, keep the existing supplementary bonding in place and record the test results.

Working in bathrooms in the field

Do

  • Measure the shower outlet height before choosing light fittings.
  • Check the IP rating on the product, not just the box.
  • Put fan isolators and fused spurs outside the zones.
  • Prove continuity from the pipework to the MET before omitting bonding.
  • Fit SELV drivers and transformers outside zones 0, 1 and 2.

Avoid

  • Quoting zone 3 or the old 3 m socket distance.
  • Leaving any bathroom circuit without a 30 mA RCD.
  • Measuring zones straight through a fixed glass screen.
  • Treating a clip-on bath panel as closing off zone 1.
  • Fitting a non-transformer shaver socket and calling it a shaver unit.

Learn the special locations properly

VoltageLab: Electrician App has lessons on BS 7671 special locations, including bathroom zones, IP ratings and the RCD and bonding rules, with quick questions to test yourself before an exam or an assessment. Choose BS 7671 as your standard when you open it.

Get it on Google Play  ·  Download on the App Store

Frequently asked questions

How many bathroom zones are there in the UK?

Three: zone 0, zone 1 and zone 2. Zone 3 was removed in the 17th Edition in 2008, and the rest of the room is now described as outside the zones.

What IP rating do I need in a bathroom?

At least IPX4 in zones 1 and 2, and IPX7 in zone 0. Use IPX5 where water jets are used for cleaning, such as communal showers. Outside the zones, Section 701 sets no IP rating, but the fitting must still suit the steamy conditions.

Can you have a socket in a bathroom in the UK?

Yes, if it is at least 2.5 m horizontally from the boundary of zone 1 and protected by a 30 mA RCD. In most domestic bathrooms that distance is not available, so the only option is a shaver supply unit to BS EN 61558-2-5.

Can a light switch be in a bathroom?

A 230 V plate switch can be fitted outside the zones. Inside zones 1 and 2 only SELV switches are allowed. A ceiling pull-cord switch is the common choice because its insulating cord is permitted in any zone.

Is the area under the bath zone 1?

Yes, if the space can be reached without a tool, such as a clip-on panel. If the bath panel is fixed so it can only be removed with a tool, the space beneath is outside the zones.

Does every bathroom circuit need an RCD?

Yes. Regulation 701.411.3.3 requires a 30 mA RCD on every low voltage circuit of the location, including lighting, and on circuits passing through zones 1 or 2 that serve somewhere else.

Is bathroom electrical work notifiable under Part P?

In England, a new circuit is always notifiable. Adding to or altering an existing circuit in a room with a bath or shower is notifiable when the work is in the special location, which Approved Document P links to the zones. Like-for-like replacement of an accessory is not. Wales and Scotland apply their own building regulations, so check locally.

The bottom line

Bathroom zones come down to three measurements: the rim of the bath or tray, 2.25 m up (or the shower head height), and 0.6 m out. A walk-in shower swaps those for a 1.2 m radius and drops zone 2. Once the zones are on the wall, the equipment choices follow: IPX4 in zones 1 and 2, no 230 V switches or sockets in any zone, and sockets 2.5 m from zone 1.

Two things keep a bathroom compliant after the tiler has gone. Put a 30 mA RCD on every circuit in the room. Then either keep the supplementary bonding, or prove all three conditions for leaving it out. Before you work on any of it, run through the safe isolation procedure, and for why the bonding path matters, see grounding and bonding essentials.

Scan to install the VoltageLab Electrician App
VoltageLab Electrician App icon
Free electrician app
Keep VoltageLab in your tool bag

Stay up to date with new electrician resources

Md Nazmul Islam
Md Nazmul Islam
Electrical engineering professional and founder of VoltageLab, focused on helping electricians and students learn faster and build real-world skills through simple, practical learning tools used by learners worldwide.

Stay up to date with new electrician resources